Flux-i Biomass Generator with Cooling Power

 

USED TO MAKE COLD & POWER FROM Bamboo and any Biomass

Absorption refrigeration cogeneration

 

Absorption refrigeration / absorber CCHP / cold absorber :

 

A refrigeration system that uses hot water at a low level of about 85 ° C . By special design an optimal heat transfer and thus a very good heat ratio of> 0.7 is achieved.

 

Refrigeration systems in the power range from 15 kW cooling capacity to provide cold water of> 8 ° C.

 

Cooling capacity

Available from 10 kW cooling capacity

21/15 kW

40/37 kW

72/54 kW

111/83 kW

 

to several hundred kW for large systems

 

Bamboo Power Generator (BCHP) NRG-B5C with absorption chiller

CHP with absorption refrigeration systems are particularly suitable for

electricity-intensive companies with applications where continuous cooling demand exists .

 

Flux-i 15 kW_e Power 20 kW Cooling

Making baseload cold and power

To use grid tie or offgrid 15.000 Watt_electrical power

Heat production 20.000 Watts_cooling power

Biomassconsumption  100...120 tons / year @  8.000 hours/year

Works without any grid, offgrid usage any time

Can be used for any (all) kinds of biomass

 

Flux-i 29 kW_e Power 40 kW Cooling

Making baseload cold and power

To use grid tie or offgrid 29.000 Watt_electrical power

Heat production 40.000 Watts_cooling power

Waste Biomasss consumption  200...250 tons / year @  8.000 hours/year

Works without any grid, offgrid usage any time

Can be used for any (all) kinds of biomass

 

Kontaktformular

© 2002-2018  KB Assembly Center
Orsoyer Straße 24
47199 Duisburg

 

 

 

 

Entwicklung und Lizensierung + Schulung, kein Geräteverkauf

 

 

 

Holzvergaser BHKW, selbst entwickelt nicht gebraucht

 

 

 

Biomasse Generator, B2, B3, B4, A1, B2 C4, D3, E2, E3, E4, NRG-B3

 

 

 

Biomass Blackoutblocker, Holzvergaseranlage Holz Kraft-Wärme Kopplung, KWK